YP AI Logo
Back to customers
Brand Standard Furnishings (BSF)

BSF project managers save 10 hours per project each week with YP.

A factory can confirm every nightstand on time and still leave the installation crew waiting. BSF’s project managers now see those clashes before they happen, and save 10 hours per project every week. Here is how.

The client

Brand Standard Furnishings (BSF) delivers furniture for hotel projects, from the factory order to the last room installed. Its project managers keep several hotel projects moving at once, each with its own factories, shipments and installation crews.

The challenge

The factory puts its ship date on the order confirmation. The hotel puts the crew’s start date on the installation plan. Read either document on its own and nothing tells the project manager the two dates conflict.

So managers rechecked orders floor by floor to find the items that could hold up an installation. That time went to checking instead of to running more projects.

The approach

We worked with BSF’s project managers on the four checks they repeat on every project: revised drawings, factory confirmations, ship dates against the installation plan, and claims for damaged or missing items. YP prepares each check; the manager decides what to do.

The solution

YP connects the documents that used to live apart: the drawing, the purchase order, the factory’s confirmation, the shipping notice and the hotel’s installation plan.

From factory order to installed room

  1. Revised drawings checked against the designer’s comments.

    Every new drawing revision is compared with the designer’s comments, so nothing goes to production on an old version.

    Use case: Shop drawings checked against the spec
  2. Factory confirmations checked against the order.

    YP checks each confirmation against the purchase order: item, finish, quantity and ship date.

    Use case: Order acknowledgments checked line by line
  3. Ship dates matched to the installation plan.

    When a ship date clashes with the crew’s start date, the manager sees the floor and room type affected, with a question to review before calling the supplier. The manager can ask for a split shipment or move the crew to another floor.

    Use case: Ship dates checked against the install plan
  4. Claims prepared for damaged or missing items.

    Items damaged or missing at installation become draft claims and replacement orders, with the deadline for each claim.

    Use case: Punch list items to replacement orders

The results

BSF’s project managers save 10 hours per project each week, and each manager can oversee more active hotel projects. A manager can call the factory about a late shipment without rechecking every order due on that floor.

The outcome

10 hours saved per project, every week

10 hours saved weekly

Per project, project management time

More active projects

Per BSF manager

4 project checks

Drawings to installation

In practice

Each BSF manager can oversee more active hotel projects and no longer rechecks every order on a floor.

How it runs

Designed for enterprise.

Private

Runs on your infrastructure. Drawings, prices, client and claims data never train a model.

Explainable

Not a black box. An AI auditor checks that every task was done as intended and proposes improvements.

Traceable

Every value links to the document, rule or record it came from. Every step is logged. A named person approves anything that leaves the building.

Your systems

Works in your ERP, CargoWise, policy system, GIS and file shares. Nothing is replaced.

Generic AI gives generic results. YP is customized to how your company works.

More case studies

Contact us

Ava is one of our AI agents. Ask her how YP would handle your drawings, CVs or invoices.

Frequently Asked Questions

Your agents do the work your experts are buried in: quotes, drawings, robot programs, invoices and month-end reports. So the same people handle more requests, answer customers sooner and win more business, while retyping and errors cost less. Your people approve what matters.

Read customer stories

No. YP is customized to how your company works, but it runs as a product: your own private platform that keeps learning from every correction your people make. We set up YP with your team, it runs from day one, and it starts from €2,500 a month.

See how we work

YP is the private AI platform where your people, AI agents and robots work together, customized to how your company works. Agents work inside the tools you already use, and your own YP starts from €2,500 a month.

See the platform

Yes. Sensitive data is masked before any model sees it, your data never leaves your environment, and it is never used to train a model.

See how we handle security

Yes. YP runs in your own cloud, on your own servers or fully offline, or we host it for your company alone.

See where your YP runs

Your own YP starts from €2,500 a month for the license, plus a service fee for setup and customization. AI usage beyond the included credits is billed separately, and YP Auto keeps those costs at least 80% lower for the same work.

See pricing

We set it up with your team, and while we work with you we need about one hour a week from your stakeholders.

See how we work

From day one, and over the first weeks we refine your agents with you.

Explore use cases

If the KPIs we agree on are not met within the first 6 weeks, we refund the service fee.

See our guarantee

Yes, your team changes everything we build in plain language.

See how agents are built