Shop drawing checker
Super Agent · YP
Checks every shop drawing version against its spec item and marks the differences.
Compares each shop drawing with its spec item and the previous version, and marks every difference. Your project manager signs off before it goes to the designer.
Each new version of a shop drawing starts a new check. The run starts when a drawing is saved to the project folder in SharePoint, as a PDF or a CAD export.
The drawing is checked against the spec. Dimensions, materials, finishes and hardware are compared with the spec item and the brand standard.
Every change since the previous version is listed. YP compares the new drawing with the last one, so nothing changes unnoticed.
The designer’s earlier comments are checked one by one. Each comment from the last review round is marked as addressed or still open.
Your project manager signs off before the drawing goes to the designer. The project manager reviews the list and submits the drawing, and nothing goes to the designer without their approval.
Dimensions, materials, finishes and hardware against the spec
Each one marked addressed or still open
Every drawing, before it reaches the designer
YP checks every shop drawing against the spec and the designer’s last comments, so drawings are approved in fewer rounds and production starts sooner.
Runs on your infrastructure. Drawings, prices, client and claims data never train a model.
Not a black box. An AI auditor checks that every task was done as intended and proposes improvements.
Every value links to the document, rule or record it came from. Every step is logged. A named person approves anything that leaves the building.
Works in your ERP, CargoWise, policy system, GIS and file shares. Nothing is replaced.

Every spec book line matched to your products or past quotes and priced with your costs, freight and duties. Your estimator decides.
Draft factory orders from the approved drawing, once finish samples and quantities are signed off. Purchasing places them.
A designer’s revision priced against the quoted version, with the drawings, orders and production it affects. Your project manager approves.