The client
ACF is a US group that makes custom furniture for hotels: guest rooms, lobbies and other public spaces. Its clients range from global hotel brands to local hotels with their own design. Production runs through its own subsidiaries and a wide supplier network, so every project crosses several teams and systems.
No two projects are the same. Each hotel brings its own mix of sizes, materials, finishes and quantities.
The challenge
A new project starts with the hotel’s spec book: often around 700 pages of requirements, drawings and attachments, with custom details for every item. Before there is any order, four departments have to work on it. Sales has to understand the request, estimating has to find earlier items and costs, engineering has to work out new custom pieces, and purchasing has to agree prices and lead times with suppliers. The quote has to be right both technically and commercially.
ACF’s teams had already started using AI, but each person in their own way. There was no shared process and no handover between departments. Knowledge was hard to reuse, and colleagues could not easily pick up each other’s work.
The approach
YP replaced the separate AI tools with one shared, private workspace for ACF, where people and AI agents work from the same company knowledge, rules and project files. We built it together with the people who know the work: estimators, engineers, purchasers and project managers. Together we set the bottlenecks, the KPIs and the moments where a person has to approve.
We started with the first workflows and measured time saved and capacity every week, adjusting as we went.
The solution
Two workflows show how it works: from the hotel’s request to a quote the client can sign and, once the hotel orders, from the approved drawing to the factory order. At every step YP prepares the work and a person decides.
From the hotel’s request to a quote the client can sign
The spec book becomes one file per item.
YP reads the spec book and creates a file for every item, such as a lounge chair or a side table, with its size, material, finish and quantity. Every line links back to the page it came from. When a size is missing or two sources disagree, the estimator gets one clear question.
Use case: Price the spec book, line by linePast work becomes the starting point.
For each item, YP finds the closest one ACF made before and shows what is different. Material, labor hours, transport, import duties and margin come from ACF’s own data and pricing rules. For a truly new piece, YP prepares a design proposal and a price request and suggests suppliers ACF has worked with. An engineer reviews it.
Engineering sees exactly what is different.
YP compares each drawing with the spec and marks the differences, for example a chair drawn 740 mm wide where the spec asks for 720 mm, next to the previous revision and earlier comments. The engineer makes the change, YP reads the new revision again, and estimating approves the price before anything goes to the hotel.
Use case: Shop drawings checked against the specA checked quote, ready for the client.
The quote goes out with every price checked and every difference resolved. Across the ACF group, the time from spec book to checked quote fell by more than 95%.
From the approved drawing to the factory order
Ordering starts only after three approvals.
Once the hotel has ordered, YP checks that the right drawing revision, the finish sample and the quantities per room type are all approved. If one approval is missing, the item stays blocked and everyone can see what is still needed.
Use case: From approved drawing to factory orderOne bill of materials, with its source on every line.
YP builds the bill of materials from the approved drawing and the supplier’s material sheet: frame, foam, fabric and glides, each line showing where it came from. Purchasing no longer copies details from separate documents, and the engineer checks the materials and quantities.
YP compares suppliers, purchasing chooses.
YP sends price requests to suitable suppliers, collects the answers and compares specification, price and lead time with the project file. It shows why each supplier does or does not fit. Purchasing makes the choice.
A complete order, ready for approval.
YP gathers the drawing, the bill of materials and the supplier’s quote, checks price, quantities and delivery date, and prepares the order in ACF’s existing ERP. The order is placed only after purchasing approves it.
The results
Across the workflows YP set up, ACF reports savings of $30,000 a week. That is the total across several processes, not the sum of the two examples above.
The gain is not only cost. The same sales and estimating team can now handle four times as many prospects. That is capacity, not a claim that revenue or win rates went up four times. Project managers save 10 hours per project each week, because drawings, revisions, materials, approvals and orders sit together and open points reach the right person.







