Inspection triage
Super Agent · YP
Turns inspection findings into a ranked list and draft work orders for your asset manager.
Reads each inspection report, records the findings against the right asset and drafts work orders ranked by your own criteria. Your asset manager decides what is done and when.
The work starts when a new inspection report is saved. A report saved to the inspection folder starts the run, and the photos and checklists are read too.
Each finding is linked to the right asset. YP matches it to the asset in your register by location and asset number.
Condition and risk are scored with your own criteria. YP applies those criteria to each finding, so the scores come from your rules and not from the model.
Findings that need action become draft work orders. The drafts are placed in one ranked list and are ready for your asset manager.
Your asset manager decides which work orders are released. The asset manager reviews the drafts, adjusts them and releases them, and no work order is released without their approval.
To the asset in your register, and scored
Draft work orders, ordered by your own criteria
Every work order, after review and adjustment
YP ranks every inspection finding by your own criteria, so your asset managers spend the maintenance budget on the highest risks first.
Runs on your infrastructure. Drawings, prices, client and claims data never train a model.
Not a black box. An AI auditor checks that every task was done as intended and proposes improvements.
Every value links to the document, rule or record it came from. Every step is logged. A named person approves anything that leaves the building.
Works in your ERP, CargoWise, policy system, GIS and file shares. Nothing is replaced.

Checks each connection request for completeness and drafts the request for missing documents. Your engineer assesses the checked file.
From the route design to permit applications and right-of-way requests, with every condition and deadline in one register.
Contractor as-built data is checked against the work order and prepared as updates for your GIS and asset register.