Changeover prep
Super Agent · YP
Collects the program, settings, fixture, material and checks for the next batch in one package.
Prepares the program changes, settings and checklist for the next batch, so your engineer reviews one complete package before the cell stops.
The work on a changeover starts from the plan. The next batch in the cell’s job list is what starts the run.
YP collects what the next batch needs. The program version, fixture, gripper and settings come from your approved records.
The checklist shows what can be done while the cell runs. Those tasks come first, such as staging the fixture and material, and the rest is listed for the stop.
Program changes are prepared for your engineer. YP drafts any program change and tests it in simulation before the review.
Your engineer reviews and approves the package. Your team then changes over, checks the first part and releases the batch.
Program, settings and checklist, ready before the stop
Fixture and material staged before the cell stops
Every program change, before your team changes over
YP prepares each changeover before the cell stops, so less of the shift goes to changeovers and more to production.
Runs on your infrastructure. Drawings, prices, client and claims data never train a model.
Not a black box. An AI auditor checks that every task was done as intended and proposes improvements.
Every value links to the document, rule or record it came from. Every step is logged. A named person approves anything that leaves the building.
Works in your ERP, CargoWise, policy system, GIS and file shares. Nothing is replaced.

Read material, dimensions and quantities from each drawing, apply your costing rules and draft the quote in your ERP.
Turn order emails and PDFs into sales orders, match customer part numbers and check prices against the agreement.
Draft routings, work orders and purchase requisitions from comparable past jobs, ready for your process planner to release.