YP AI Logo
Construction & installation

Take-off from the tender documents

Reads the tender documents, drafts the take-off or prices the client’s bill of quantities with your own rates. Your estimator checks it and decides what goes in the bid.

An architect working on a drawing with a ruler
YP×
When
When a tender arrives
Systems
OutlookAutoCADRevitEstimating tool
Mode
Drafts only. Your estimator approves every bid
Problem

Every tender follows the same steps. Measure the quantities from the drawings or check the ones in the client’s bill, read the specification for materials and standards, and price each item against your rates. The take-off is retyped into the estimating tool, and the pricing logic sits in old bids and in your estimators’ heads.

What it does

YP reads the drawings, specification and tender Q&A, takes quantities from the model or measures them on the drawings, and applies your unit rates, labor norms and margins. It drafts a priced bill of quantities in your estimating tool, with each line linked to the drawing, specification clause or rate it came from.

How it works

See exactly how the work gets done.

The work starts the moment a tender arrives. A new tender in the bids inbox or project folder starts the run, and the drawings, specification, any client bill of quantities and the tender Q&A are read.

The quantities come from the building model or are measured on the drawings. Where there is a model, it gives the areas, lengths and counts per element and floor. Measurements on PDF drawings are marked on the drawing for checking.

Every item is priced with your own rates. Unit rates, labor norms and margins come from your own sheets and past bids, so the prices come from your data and not from the model.

YP drafts a question when something is unclear and does not guess. A conflict between drawing and specification, or a missing dimension, becomes a draft question for the tender Q&A, with the question deadline shown. Your estimator decides whether to send it.

Your estimator decides what goes in the bid. The estimator reviews the bid, adjusts it and finalizes it, and nothing goes to the client without their approval.

The outcome

Your estimators review a draft instead of measuring from scratch. The rates and pricing rules are written down and stay with the company.

01
Bill of quantities priced

Quantities from the model or marked on the drawings

02
Conflicts become questions

Drafted for the tender Q&A, deadline shown

03
Estimator approves

Every bid, before it reaches the client

For your numbers

YP drafts the take-off and priced bill of quantities, so your estimators bid on more tenders and raise conflicts before they become your cost.

How it runs

Designed for enterprise.

Private

Runs on your infrastructure. Drawings, prices, client and claims data never train a model.

Explainable

Not a black box. An AI auditor checks that every task was done as intended and proposes improvements.

Traceable

Every value links to the document, rule or record it came from. Every step is logged. A named person approves anything that leaves the building.

Your systems

Works in your ERP, CargoWise, policy system, GIS and file shares. Nothing is replaced.

Not sure where to start?

Put AI to work on your most complex workflows.

Frequently asked questions